Project information

Evrencik WPP

Project ID: BCR-TR-152-1-001
Project Name: Evrencik WPP
Project Holder: SEKANS ENERJI LIMITED SIRKETI
Project Participants: Evrencik Rüzgar Enerjisinden Elektrik Üretim A.S. SEKANS ENERJI LIMITED SIRKETI
Certification Body: Re Carbon Ltd.
Methodology: CDM - ACM0002_Grid-connected electricity generation from renewable sources
Quantification Period: 2020-10-14 to 2027-10-13
Verified GHG Emission Reductions or Removals: 0
Sector: Energy industries (renewable sources / energy efficiency)
Migrated from:
Country: Turkey

Location

Click here to download the project coordinate files.

Description

Evrencik WPP is a wind power plant, located in Kırklareli Province, Türkiye. The purpose of the Project is to produce renewable electricity using wind as the power source and to contribute to Turkey’s growing electricity demand through a sustainable and low carbon technology. The project will displace the same amount of electricity generated by the grid dominated by fossil fired power plants.The purpose of the Project is to produce renewable electricity using wind as the power source and to contribute to Turkey’s growing electricity demand through a sustainable and low carbon technology. The annual emission reduction estimated by the project is 272,835 tCO2.

Project summary

Project document

Validations & Verificacions