Click here to download the project coordinate files.
Arel Milas LFG & Biomethanisation Plant Project is located at Milas Landfill Site in Yokuşaltı Locality, Burgaz Neighborhood, Milas District, Muğla Province Türkiye. The project is owned by Arel Çevre Yatırımları Enerji ve Elektrik Üretim A.Ş. . The project includes two components: (i) the capture and extraction of landfill gas (LFG) from the landfill site for electricity generation, and (ii) the anaerobic decomposition of organic waste in an anaerobic digester, leading to biogas generation and its use for electricity generation. Currently, only the first component is operational, while the second component has not yet been commissioned. Therefore, during this crediting period, credits will be claimed only from the electricity generation of the LFG, and no credits will be claimed from the second component. The plant started operation on 06.12.2019 with capacity of 1.45 MWm / 1.41 MWe with one gas engine. The total installed capacity is 2.90 MWm / 2.82 MWe with two gas engines.
{{ translations.credits?.table?.columns?.serial || 'Serial' }} | {{ translations.credits?.table?.columns?.total_credits || 'Total Credits' }} | {{ translations.credits?.table?.columns?.available || 'Available' }} | {{ translations.credits?.table?.columns?.sold || 'Retired' }} | {{ translations.credits?.table?.columns?.issuance_date || 'Issuance Date' }} |
---|---|---|---|---|
|
||||
{{ credit.serial }} | {{ credit.amount }} | {{ credit.active }} | {{ credit.sold }} | {{ formatDate(credit.created_at) }} |
{{ translations.retreats?.table?.serial || 'Serial' }} | {{ translations.retreats?.table?.initial_serial || 'Initial serial' }} | {{ translations.retreats?.table?.final_serial || 'Final serial' }} | {{ translations.retreats?.table?.amount || 'Amount' }} | {{ translations.retreats?.table?.date || 'Date' }} |
---|---|---|---|---|
|
||||
{{ retreat.serial }} | {{ retreat.initial_serial }} | {{ retreat.final_serial }} | {{ retreat.amount }} | {{ formatDate(retreat.created_at) }} |